MY SHACK PROJECT.
In May 2020 I moved to Ashbourne on the Fleurieu Peninsula, south of Adelaide.
Below are some photos of my shack project out in the shed.
The shack was built in a corner of the shed underneath the mezzanine.
MANY THANKS to my handyman Tony.
Below are some photos of my shack project out in the shed.
The shack was built in a corner of the shed underneath the mezzanine.
MANY THANKS to my handyman Tony.
INITIAL BUILD OF THE SHACK.
SHACK EXTENSION.
In August 2023, work commenced on extending the shack.
Two large sheds side by side. A space between the two sheds was created and the wall of the existing shack was knocked out.
Day 1.
Day 2.
Day 3.
Day 4.
Day 5.
Day 6 - Friday 11th August 2023.
Electrician installed wiring.
Insulation added.
Ceiling commenced.
Insulation added.
Ceiling commenced.
Day 7 - Saturday 12th August 2023
Day 8 - Monday 14th August 2023 and day 9 - Tuesday 15th August 2023.
Day 10 - Wednesday 16th August 2023, Day 11 - Thursday 17th August 2023, & Day 12 Friday 18th August 2023.
Cornices installed and walls sanded ready for painting.
Ceiling painted.
Ceiling painted.
Day 13 - Saturday 19th August 2023.
Walls painted and most of the timber flooring installed.
Completed project.